For
Transmission & Distribution Lines
Notes
i.
On some of the old 220KV lines one distance scheme with
backup directional IDMT 3 O/L & E/L relays were provided.
ii.
On some of the 132KV grid lines, only distance scheme
is available
iii.
Very few 66KV lines are in service (which are also
being phased out)
Busbars :
All 220 KV busbars will have busbar protection scheme with main and check
zone.
For POWER STATIONS
Breaker failure protection: The
LBB protection scheme will be provided for all 220KV stations (along with
busbar protection scheme)
Transformers
i.
No Buchholz relay for transformers below 500 KVA
capacity
ii.
Transformers upto 1500 KVA shall have only Horn gap
protection
iii.
Transformers above 1500 KVA and upto 8000 KVA of
33/11KV ratio shall have one group control breaker on HV side and individual LV
breakers if there is more than one transformer.
iv.
Transformers above 8000 KVA shall have individual HV
and LV circuit
breakers.
v.
The relays indicate above shall be provided on HV and LV
vi.
LAs to be provided on HV & LV for transformers of
all capacities and voltage class.
vii.
OLTC out of step protection is to be provided where
Master follower scheme is in operation
viii.
Fans failure and pumps failure alarms to be connected.
ix.
Alarms for O.T., W.T., Buchholz (Main tank & OLTC)
should be connected.
No comments:
Post a Comment